Det
krog type sprængning maskinehar generelt et større udseende, og installationsprocessen er relativt mere kompliceret end for lille udstyr. Korrekt installation og testmaskine er nøglen til at sikre, at det senere udstyr fungerer normalt. I tilfælde af ufaglærte indledende operationer er brugerne forpligtet til nøje at følge instruktionerne fra relevant personale eller henvise til instruktionerne. Uautoriseret betjening kan let forårsage irreversibel skade på
sprængning maskine. Detshot blasting machine manufacturer has sorted out the precautions for installation and test machine to share with you. I hope it will be helpful to users who use the device for the first time.
1. Installation. Det
krog type sprængning maskine is installed and debugged in the production plant and disassembled into several parts before being transported to the user site for installation. Although there is no pit, the foundation must be firm, the anchor bolt holes must be standardized, and the chamber body must be adjusted. After the second irrigation, the anchor bolt nuts can be tightened after solidification. After the chamber body is fixed, the various parts can be installed. Detprecautions for the installation and debugging of the relevant components are introduced below.
1. Skudblæsningsanordning:
Detshot blasting device has been installed on the chamber body before leaving the factory. Please pay attention to the problems to be debugged before use. Check whether the fixed positions of the blade, the pill wheel, the directional sleeve, and the guard plate are accurate and firm, and check whether the direction of rotation is correct after power on. Then adjust the position of the directional sleeve opening. Theoretically, the angle between the front edge of the directional opening and the front edge of the blade throwing position is about 900. After fixing the position of the directional sleeve, the position of the projectile belt can be detected by hanging Place a steel plate or wooden board on the position of the workpiece facing the exit of the shot blasting machine, start the shot blasting machine, put a small amount (2-5kg) of projectiles into the blasting tube, and then stop, check whether the hit position on the steel plate is suitable for the needs, such as Close the window of the bias-adjustable directional sleeve downwards, and vice versa, until it fits, and note the position of the directional sleeve opening as a basis for future replacement of the directional sleeve.
2. Hejse- og skruetransportør:
Udfør først en ikke-belastningstest for at kontrollere, om hejsespanden og spiralklingerne kører i den rigtige retning, og stram derefter løftens bælte til en moderat grad af spænding for at undgå afvigelse, og udfør derefter en belastningstest for at kontrollere betjenings- og transportkapacitet, uanset om der er noget underligt Støj og vibrationer, kontroller og fjern forhindringer.
3. Pill-sand separator:
Kontroller først, om stemplets bevægelse er fleksibel, og kontroller derefter den adskilte plades korrekte position. Derefter når hejseværket læsses og debugges, er der kontinuerlig tilstrømning af stålskud, og kontroller, om stålskuddene flyder ud og falder når renden er afladet